The FAA has released a Draft Advisory Circular detailing updated draft design standards for vertical lift infrastructure and their supporting infrastructure and is inviting comments from industry stakeholders.
The AC is an initial proposal for industry feedback and will help airport and heliport owners, operators and infrastructure developers design facilities for vertical takeoff and landing (VTOL) aircraft, and combines previous design guidance for heliports and vertiports.
“The next generation of aircraft is here, and we are ensuring we have the infrastructure built to support safe takeoffs and landings for them across the National Airspace System,” said FAA Administrator Bryan Bedford. “These aircraft have tremendous potential to generate new jobs, connect communities, and strengthen American leadership in aviation.”
The design standards include:
- Core Layout and Operating Space: Standards for essential facility elements, including the touchdown and liftoff areas, final approach areas, safety areas, and approach surfaces.
- Lighting, markings and visual aids: Guidance for markings, perimeter lighting, glideslope indicators and visual aids for pilots.
- Power and Charging Systems: Requirements for aircraft fueling and electric charging systems for aircraft fleets.
- Airport Integration: Standards for integrating vertical flight infrastructure at existing airports without disrupting current operations.
- Elevated and Rooftop Facilities: Design guidelines for touchdown and liftoff areas built on suitable rooftops and elevated building structures.
The deadline for comments on the draft AC are due by January 11 with the final standards expected during the summer of 2027.
To read the Draft AC click HERE
Image:






